djhollowman Posted September 7, 2007 Report Posted September 7, 2007 Hi all, I've only ever worked with tremolo bridges before, but I'm building a string-thru with a tunomatic bridge. I'm assuming it gets earthed? If so, how? It's a new-build, so I can pretty much do anything with it still- ie, there are no existing holes, measurements etc to worry about. Appreciate any help guys! Cheers, DJ Quote
killemall8 Posted September 7, 2007 Report Posted September 7, 2007 Hi all, I've only ever worked with tremolo bridges before, but I'm building a string-thru with a tunomatic bridge. I'm assuming it gets earthed? If so, how? It's a new-build, so I can pretty much do anything with it still- ie, there are no existing holes, measurements etc to worry about. Appreciate any help guys! Cheers, DJ earthed= grounded? if so, drill a small 1/8" hole from inside the post hole into the control cavity. thats the easiest way. and i always drill a small hole in the bottom of the post, and wrap a wire around thru the hole and into the cavity. Quote
Mickguard Posted September 7, 2007 Report Posted September 7, 2007 Well, it's much easier to drill from the control cavity into the post hole , but yeah, same idea. The wire gets wedged in against the bushing. Quote
djhollowman Posted September 7, 2007 Author Report Posted September 7, 2007 Ahhh.......I see it now! Thanks guys!! DJ Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.