Jump to content

Recommended Posts

Posted

Hi all,

I've only ever worked with tremolo bridges before, but I'm building a string-thru with a tunomatic bridge.

I'm assuming it gets earthed? If so, how?

It's a new-build, so I can pretty much do anything with it still- ie, there are no existing holes, measurements etc to worry about.

Appreciate any help guys!

Cheers,

DJ

Posted
Hi all,

I've only ever worked with tremolo bridges before, but I'm building a string-thru with a tunomatic bridge.

I'm assuming it gets earthed? If so, how?

It's a new-build, so I can pretty much do anything with it still- ie, there are no existing holes, measurements etc to worry about.

Appreciate any help guys!

Cheers,

DJ

earthed= grounded?

if so, drill a small 1/8" hole from inside the post hole into the control cavity. thats the easiest way. and i always drill a small hole in the bottom of the post, and wrap a wire around thru the hole and into the cavity.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...