Wudn't me
Wudn't accusin', although reading it back, by capitalizing 'mod' I made it look accusatory. My bad.
and yeah, post some progress so this thread goes back on track. See what happens when you build slow?
Tell me about it!
I had two builds underway at the same time (this and the 7 string SS) when my other half decided lease a building and volunteer my services to turn it into a retail store. When I saw it, she'd leased a office complex, so I had to strip the place, a complete demolition back to empty shell, build new walls and all internal structures, rebuild a front counted she purchased off ebay but it turned out to be a chipboard piece of shite that was left out in the rain - so i had to pretty much make her a new one, build timber furnature for the shop, paint the whole place, make curtain rails and shop window platforms and pretty much do everything except the plastering and electrical. Oh - add wall decals and painting second hand cabinets and installing wall racks that were handmade by a blacksmith along with installing a digital security system and a million other things!
Long story short I've been flat out for the last couple months and I'm sorry, these builds were put on the back burned and the thread de-railed! I accept full responsibility!
Heres a few pics:
The front during the demolition/build stage. The reflection is me and my work ute!
Change rooms during construction (using second hand timber from the demolition to cut costs)
One of the dividing walls with inbuilt rack:
Wall rack installed and the skirting boards painted and installed:
Reconstruction of the front counter: